Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-5_394
REMOVAL - TM-9-2350-277-20-5_396
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
315
316
317
318
319
320
321
322
323
324
325
TM 9-2350-277-20-5
REPLACE BATTERY DRAWER INSULATION AND
HEAT EXCHANGER
(M1064A3 ONLY)
0719 00
THIS WORK PACKAGE COVERS:
Removal (page 0719 00-1).
Cleaning (page 0719 00-2).
Inspection and Repair (page 0719 00-2).
Installation (page 0719 00-2).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Materials/Parts
Sealing compound (WP 0928 00, Item 53)
Sodium bicarbonate (WP 0928 00, Item 60)
P
ersonnel
Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Batteries removed (WP 0349 00)
Carrier
cooling system
drained (WP 0227 00)
Coolant
heater system
drained (WP 0710 00)
REMOVAL
1.
Remove four nuts (1), washers (2), screws (3), and two brackets (4) from battery drawer (5).
2.
Loosen four clamps (6). Remove two hoses (7) from
heat exchanger
(8) and two elbows (9). Remove clamps from hoses.
3.
Remove battery drawer (WP 0353 00).
4.
Remove heat exchanger (8) from battery drawer (5).
5.
If damaged, remove top insulation sheet (10), bottom insulation sheet (11), rear insulation sheet (12), right insulation
sheet (13), and left insulation sheet (14) from battery drawer shield (15).
0719 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business