Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-5_386
REMOVAL - TM-9-2350-277-20-5_388
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
308
309
310
311
312
313
314
315
316
317
318
TM 9-2350-277-20-5
REPLACE
ENGINE BLOCK
FITTING AND HARDWARE
0717 00
THIS WORK PACKAGE COVERS:
Removal (page 0717 00-1).
Installation (page 0717 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Sealing compound (WP 0928 00, Item 56)
Gasket
Lockwasher (2)
Personnel Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Ramp lowered (see your -10)
Power plant rear access panel removed (see your -10)
Drivers compartment access panel removed
(see your -10)
Power plant grill raised (WP 0464 00)
Coolant
heater system
drained (WP 0710 00)
REMOVAL
1.
Loosen clamp (1) and disconnect hose (2) from elbow (3).
2.
Remove screw (4), two washers (5), nut (6), and two clamps (7) that secure hose (2) to
engine block
.
3.
Remove elbow (3) and drain cock (8) from fitting (9).
0717 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business