Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
ASSEMBLY - TM-9-2350-277-20-5_333
REMOVAL - TM-9-2350-277-20-5_336
TM-9-2350-277-20-5 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
260
261
262
263
264
265
266
267
268
269
270
TM 9-2350-277-20-5
REPLACE PERSONNEL HEATER ASSEMBLY (ALL EXCEPT M1064A3)
0703 00
THIS WORK PACKAGE COVERS:
Removal (page 0703 00-2).
Installation (page 0703 00-5).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Lockwasher (11)
P
ersonnel
Required
Unit Mechanic
R
eferences
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground strap disconnected (WP 0337 00),
(WP 0338 00), or (WP 0339 00)
Power plant rear access panel removed (see your -10)
Heater hose removed from plenum (WP 0706 00)
Spall liners open (M113A3 only) (see your -10)
0703 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business