TM 9-2350-277-20-5REPAIR PERSONNEL HEATER CONTROL BOX — Continued 0702 005. Install circuit breaker (12) in control box (2).a. Install circuit breaker (12) in control box (2). Secure with four new lockwashers (17), two screws (16), ground lead(15), and two nuts (18).b. Install lead 17-D (19), lead 17-3 (11), and jumper 15-17 (20) on one terminal, and lead 16 (21) on other terminal ofcircuit breaker (12). Secure with two lockwashers (13) and screws (14).FOLLOW-THROUGH STEPS1. Install heater control box (WP 0701 00).END OF TASK0702 00-9/10 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business