Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-4_395
REMOVAL - TM-9-2350-277-20-4_398
TM-9-2350-277-20-4 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
313
314
315
316
317
318
319
320
321
322
323
TM 9-2350-277-20-4
REPLACE FORWARD SPALL LINER AND BRACKET (M113A3 ONLY)
0507 00
THIS WORK PACKAGE COVERS:
Removal (page 0507 00-1).
Installation (page 0507 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Torque
Wrench (WP 0926 00, Item 85)
Materials/Parts
Locknut (8)
Personnel Required
Unit Mechanic
R
eferences
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Dome light disconnected (WP 0309 00)
REMOVAL
1.
Remove four screws (1), washers (2), and locknuts (3) from lower spall liner backing plate (4) and sponson bracket (5).
Discard locknuts.
0507 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business