TM 9-2350-277-20-4
REPLACE FORWARD UPPER RIGHT AND LEFT SIDE SPALL LINERS (M113A3 ONLY)
Continued
0508 00
INSTALLATION
1.
Install spall liner (4) on ceiling with seven screws (1), washers (2), and new lockwashers (3).
FOLLOW-THROUGH STEPS
1.
Start engine (see your -10).
2.
Raise and lock ramp (see Your -10).
3.
Stop engine (see your -10).
END OF TASK
0508 00-2