Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-4_224
DISASSEMBLY - TM-9-2350-277-20-4_226
TM-9-2350-277-20-4 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
166
167
168
169
170
171
172
173
174
175
176
TM 9-2350-277-20-4
REPAIR TRIM VANE (ALL EXCEPT M58)
0459 00
THIS WORK PACKAGE COVERS:
Disassemble (page 0459 00-1).
Inspection and Repair (page 0459 00-2).
Assemble (page 0459 00-3).
INITIAL SETUP:
Maintenance
Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Locknut ( 31)
Locknut ( 9)
Locknut ( 2)
P
ersonnel
Required
Unit Mechanic
E
quipment
Condition
Trim vane removed (WP 0458 00)
DISASSEMBLY
1.
Remove seven locknuts (1), 14 washers (2), and seven screws (3) from front pod (4), rear pod (5), and trim vane (6).
Discard locknuts.
0459 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business