TM 9-2350-277-20-3REPLACE MASTER SWITCH PANEL DOME LIGHTS LEAD ASSEMBLY (M577A3 ANDM1068A3 ONLY) — Continued0380 00INSTALLATION1. Replace gasket (11) if damaged.2. Place new grommet (10) on branch of lead assembly (6) that connects to circuit 38E lead (9).3. Install lead assembly (6) with grommet (10) in master switch panel (4).4. Connect lead assembly (6) to circuit 38E lead (9), circuit breaker (8), and front dome light switch (7).5. Place master switch panel (4) on distribution box (5). Secure with eight screws (3), washers (2), and new locknuts (1).FOLLOW-THROUGH STEPS1. Connect battery ground lead (WP 0338 00).2. Turn MASTER SWITCH ON (see your -10).3. Operate dome lights to check that lights operate properly (see your -10).4. Turn all switches OFF (see your -10).END OF TASK0380 00-3/4 blank
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business