Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REMOVAL (cont) - TM-9-2350-277-20-3_713
REMOVAL - TM-9-2350-277-20-3_716
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
612
613
614
615
616
617
618
619
620
621
622
TM 9-2350-277-20-3
REPLACE AUXILIARY POWER (SLAVE) RECEPTACLE GROUND LEAD
(M113A3, M901A3, M1059A3, M1064A3, AND M58 ONLY)
0379 00
THIS WORK PACKAGE COVERS:
Removal (page 0379 00-1).
Installation (page 0379 00-3).
INITIAL SETUP:
M
aintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Grommet
Locknut (8)
Locknut
Lockwasher
P
ersonnel
Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground strap disconnected (WP 0337 00)
REMOVAL
1.
Remove eight locknuts (1), washers (2), screws (3), and master switch panel (4) from distribution box (5). Discard
locknuts.
0379 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business