Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-3_435
REMOVAL - TM-9-2350-277-20-3_438
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
351
352
353
354
355
356
357
358
359
360
361
TM 9-2350-277-20-3
REPLACE BATTERIES AND RETAINERS (LEFT SIDE) (M1064A3 ONLY)
0349 00
THIS WORK PACKAGE COVERS:
Removal (page 0349 00-1).
Cleaning and Inspection (page 0349 00-4).
Installation (page 0349 00-4).
INITIAL SETUP:
Maintenance
Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Battery Wire Brush (WP 0926 00, Item 10)
Materials/Parts
Epoxy coating kit (WP 0928 00, Item 30)
Sodium bicarbonate (WP 0928 00, Item 60)
Wiping rag (WP 0928 00, Item 65)
Personnel
Required
Unit Mechanic
Helper (H)
References
See your -10
TM 9-6140-200-14
E
quipment
Condition
Engine stopped (see your -10)
Battery leads disconnected and terminal lugs
removed (WP 0343 00)
REMOVAL
CAUTION
Do not start carriers while batteries are disconnected. Starting engine with outside power while
batteries are disconnected will damage electrical components in the regulator.
0349 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business