Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION - TM-9-2350-277-20-3_212
REMOVAL - TM-9-2350-277-20-3_214
TM-9-2350-277-20-3 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 (EIC AE7) Carrier Command Post Light Tracked M577A3 2350-01-369-6085 (EIC AE7) Manual
Page Navigation
153
154
155
156
157
158
159
160
161
162
163
TM 9-2350-277-20-3
REPLACE INSTRUMENT PANEL BATTERY-
GENERATOR
GAUGE WIRING
HARNESS (ALL EXCEPT M981A3)
0289 00
THIS WORK PACKAGE COVERS:
Removal (page 0289 00-1).
Installation (page 0289 00-3).
INITIAL SETUP:
Maintenance Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
M
aterials/Parts
Locknut (10)
Lockwasher
Lockwasher
P
ersonnel
Required
Unit Mechanic
References
See your -10
E
quipment
Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery ground strap disconnected (WP 0337 00) or
(WP 0338 00)
Tachometer
and speedometer disconnected from
instrument panel gages (WP 0859 00) and
(WP 0862 00)
REMOVAL
1.
Remove two locknuts (1), mounts (2) and (3), washers (4), and screws (5) that secure instrument panel (6) to two struts
(7). Discard locknuts.
0289 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business