Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
FOLLOW-THROUGH STEPS - TM-9-2350-277-20-2_632
INSTALLATION - TM-9-2350-277-20-2_634
TM-9-2350-277-20-2 Carrier Personnel Full Tracked Armored M113A3 2350-01-219-7577 Carrier Command Post Light Tracked M577A3 2350-01-369-6085 Manual
Page Navigation
545
546
547
548
549
550
551
552
553
554
555
TM 9-2350-277-20-2
REPLACE
COOLANT PUMP
IDLER PULLEY/BELTS
0240 00
THIS WORK PACKAGE COVERS:
Removal (page 0240 00-1).
Installation (page 0240 00-2).
INITIAL SETUP:
Maintenance
Level
Unit
Tools and Special Tools
General Mechanic’s Tool Kit (WP 0926 00, Item 65)
Torque
Wrench (WP 0926 00, Item 81)
Socket Set (WP 0926 00, Item 72)
M
aterials/Parts
Belts
Lockwasher (2)
Personnel Required
Unit Mechanic
R
eferences
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Power plant rear access panels removed
(see your -10)
REMOVAL
1.
Loosen two screws (5) securing idler adjusting bracket (2) to engine.
2.
Remove two
drive belts
(4) from three pulleys (1)(3)(6).
0240 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business