TM 9-2350-277-20-2
CLEAN RADIATOR Continued
0228 00
12. Secure radiator access door (1) to radiator opening with two fasteners (2).
13. Secure radiator access panel (3) to power plant compartment bulklhead with two clamps (4) and bolts (5).
FOLLOW-THROUGH STEPS
1.
Install power plant bottom access cover (WP 0450 00).
2.
Install drivers power plant access panel (see your -10).
3.
Install power plant rear access panel (see your -10).
4.
Close power plant front access door (see your -10).
5.
Raise trim vane (see your -10).
END OF TASK
0228 00-4