TM 9-2350-277-20-2REPLACE HAND THROTTLE CONTROL CABLE ASSEMBLY 0219 00THIS WORK PACKAGE COVERS:Removal (page 0219 00-1).Installation (page 0219 00-4).Adjustment (page 0219 00-6).INITIAL SETUP:Maintenance LevelUnitTools and Special ToolsGeneral Mechanic’s Tool Kit (WP 0926 00, Item 65)Materials/PartsLocknutLockwasherTie strapsPersonnel RequiredUnit MechanicReferencesSee your -10Equipment ConditionEngine stopped (see your -10)Carrier blocked (see your -10)Trim vane lowered (see your -10)Power plant front access door opened (see your -10)Driver’s power plant access panel removed(see your -10)Power plant front access cover removed (WP 0449 00)REMOVAL1. Remove screw (1), lockwasher (2), and clamp (3) from throttle control cable (4) and weldnut (5) on upper front plate.Discard lockwasher.0219 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business