TM 9-2350-277-20-2REMOVE/INSTALL POWER PLANT ASSEMBLY — Continued 0156 007. Install elbow (1) on turbo inlet (2) and exhaust manifold (3). Secure with two clamps (4).8. Install pivot shaft link (5) on pivot shaft (6). Secure with flat washer (7) and new cotter pin (8).9. Install brake arms (9) and (10), links (11), and bearing (12) on transmission. Secure with two flat washers (13), newlockwashers (14), and screws (15).10. Install lower bearing (12) on shaft link (5). Secure with pin (16), two washers (17), and new cotter pin (18).11. Install link (19) on link (5). Secure with pin (20), two washers (21), and new cotter pin (22).0156 00-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business