TM 9-2350-277-20-2
REMOVE/INSTALL POWER PLANT ASSEMBLY Continued
0156 00
NOTE
If engine mounts have been replaced, make sure mounts are aligned with hull mounts and nuts
are torqued (WP 0158 00) before detaching sling.
Make sure spacer plate (half ring) is in the right side transmission mount slot before lowering
power plant.
2.
Lower power plant into carrier. Detach sling. Have helper assist.
0156 00-14