TM 9-2350-277-20-2REMOVE/INSTALL POWER PLANT ASSEMBLY — Continued 0156 00NOTEIf engine mounts have been replaced, make sure mounts are aligned with hull mounts and nutsare torqued (WP 0158 00) before detaching sling.Make sure spacer plate (half ring) is in the right side transmission mount slot before loweringpower plant.2. Lower power plant into carrier. Detach sling. Have helper assist.0156 00-14
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business