TM 9-2350-277-20-2PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDINGLUBRICATION INSTRUCTIONS — Continued0155 00ITEMNO.INTERVALMAN-HOURITEM TO BECHECKED ORSERVICEDCREWMEMBERPROCEDUREEQUIPMENTNOT READY/AVAILABLEIF:49Semi-AnnualElectricalConnectors andLeadsa. Check electrical connectors for looseness orbroken contact. Replace broken connectors(WP 0382 00).b. Check that electrical leads in power plantcompartment are not frayed, cut, or broken. Ifleads are damaged, identify damaged lead. Goto the Table of Contents for electrical lead/harness connectors repairs and locate thespecific task to repair or replace the damagedlead or wiring harness.ELECTRICAL CONNECTORSELECTRICALCONNECTORSELECTRICAL LEADS50Semi-Annual0.5Drive Shafts andUniversal JointsNOTESee Step 1g under General MaintenanceInstructions for proper use of torquewrench adapter.a. Check for loose or missing screws andlockwashers on universal joints. Tighten loosescrews to 86-92 lb-ft (117-127 N m) torque. Usetorque wrench (WP 0926 00, Item 79) andadapter (WP 0926 00, Item 4).Any hardwareis loose,broken, ormissing.015500-96
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business