TM 9-2350-277-20-2
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS), INCLUDING
LUBRICATION INSTRUCTIONS Continued
0155 00
ITEM
NO.
INTERVAL
MAN-
HOUR
ITEM TO BE
CHECKED OR
SERVICED
CREWMEMBER
PROCEDURE
EQUIPMENT
NOT READY/
AVAILABLE
IF:
55
Semi-
Annual
Power Plant
Mount
a. Tighten loose mount screws (on forward engine
mount) to 100-120 lb-ft (136163 N m) torque.
Use torque wrench (WP 0926 00, Item 85) and
socket set (WP 0926 00, Item 71).
Any cracked
or broken nuts.
MOUNT SCREWS
0155
00-100