13-4
Change 4
TM 9-2350-267-34
PROJECTILE RACK ASSEMBLY: REPAIR (Continued)
P Remove two screws (16), two lockwashers (17) and locking shoe (18)
from each locking bar (19). Discard lockwashers.
Q Remove nine cotter pins (20) and nine pins (21). Discard cotter
pins.
R Remove nine locking bars (19).
INSPECTION AND REPAIR
Inspect all parts for exeessive wear or damage. Replace as necessary.