6-100.2
Change 3
TM 9-2350-267-20
ACCESSORY CONTROL BOX TO AFES HARNESSES, AFES RELAYS AND PERSONNEL VENTILATION BLOWER WIRING
HARNESS (12351461): REMOVAL, DISASSEMBLY, ASSEMBLY AND INSTALLATION (CONTINUED)
M
N
O
P
Q
R
Install screw (7), flat washer (8) and new lockwasher (9) to each of
three strap assemblies (6).
Connect ground wire (5) to forward bulkhead and secure it by
installing two new lockwashers (4) and screw (3).
Connect harness plug (1) to personnel ventilation blower (2).
Connect ground cable (6-44).
Reactivate engine AFES (p 14-14.5) and crew AFES (p 14.14.8).
Move left projectile rack toward front of vehicle (TM 9-2350-267-10).