18-2
TM 9-2350-267-20
When material is inactive for a limited time (not to exceed 90 days), process in
If vehicle to be shipped will reach its destination within limited storage period, it
accordance with TM 740-90-1.
need not be reprocessed when removed from storage, unless necessary because of
anticipated in transit weather conditions.
Prepare DD Form 6 for all shipments received in damaged or otherwise unsatisfactory
condition due to deficiencies in preservation packaging, marking, handling,
When vehicle is to be place into service, immediately deprocess in accordance with
loading, or storage, and for apparently excessive preservation.
instructions on DD Form 1397.
Preferred storage site for vehicle is in dry covered sheds. When it is necessary to
LOADING
stem material outdoors protect it against the elements as prescribed in SB 740-1
and TM 743-200.
INSPECTION DURING STORAGE
Perform visual inspection periodically to determine general condition. If corrosion
is found, remove it and clean, paint and treat vehicle with prescribed preservatives.
NOTE
Touch-up painting will be in accordance with TM 43-
When vehicle is shipped by rail, every precaution must be taken to see that it is
0139.
properly loaded, blocked and securely fastened to flatcar floor.
REMOVAL FROM LIMITED STORAGE
Inspect flatcar prior to loading. Make sure it is in suitable condition to carry loads
safely.
If vehicle is not shipped or issued upon expiration of limited storage period, process
as applicable m accordance with MIL-H-46709.
CAUTION
Height and width of vehicle, when prepared for rail
transportatio, must not exceed limitations prescribed
for particular railroad lines. Whenever possible, local
transportation officers must be consulted about limitations
of particular railroad lines to be used for movement in
order to avoid delays, dangerous conditions or damage to
equipment.
TA310398