11-22Change 4TM 9-2350-267-20INSTALLATIONA Install and buckle two strap assemblies (20) and two strap assemblies (21)on right front canister compartment (22).B Install six strap studs (19) by turning clockwise.C Hook three snap hooks (17 and 18) and three ratchet buckles (15 and 16) totighten three strap assemblies (13 and 14). Secure three ratchet buckleassemblies (15 and 16).D Install six eyebolts (7) on rack assembly with six flat washers (12), six newlockwashers (11) and six nuts (10).EInstall restraint straps (5) on bar assemblies (8) (p 11-23).FSlide three bar assemblies (8), with attached restraint straps (5) onto bar slidehacks (9).G Hook six snap hooks (6) to six eyebolts (7) and tighten three restraint straps(5) by pushing release plate of three buckles (4).H Insert clip end of four straps (2) through upper rack and vehicle-mountedfasteners (3) and secure spring-action buckle (1).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business