11-2.2
Change 2
TM 9-2350-267-20
PROJECTILE RACK STOWAGE BOX GUARD PLATE ASSEMBLY: REMOVAL, DISASSEMBLY, ASSEMBLY AND INSTALLATION
(CONTINUED)
INSTALLATION
A Install two brackets (7) and shims (8) on vehicle top doors us-
ing two screws (9), two new lockwashers (10) and two flat
washers (11) for each bracket (7).
B
Install guard plates (2 and 3) on projectile stowage boxes (5 and
6) by grasping each pivot bar (4) and pushing straight in.
C Fold up two guard plates (2 and 3) and secure quick-release pins
(1).
TA58026