11-2.2Change 2TM 9-2350-267-20PROJECTILE RACK STOWAGE BOX GUARD PLATE ASSEMBLY: REMOVAL, DISASSEMBLY, ASSEMBLY AND INSTALLATION(CONTINUED)INSTALLATIONA Install two brackets (7) and shims (8) on vehicle top doors us-ing two screws (9), two new lockwashers (10) and two flatwashers (11) for each bracket (7).BInstall guard plates (2 and 3) on projectile stowage boxes (5 and6) by grasping each pivot bar (4) and pushing straight in.C Fold up two guard plates (2 and 3) and secure quick-release pins(1).TA58026
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business