TM 9-2350-261-20-4
REPLACE/REPAIR POWER DISTRIBUTION BOX A3 (M1068 ONLY) -- Continued
0736 00
INSTALLATION
1.
Install two circuit 1 leads (1) through back of power distribution box (2). Secure to terminal (3) with washer (4) and
screw (5). Have helper assist.
2.
Install two circuits 2 leads (6) through back of power distribution box (2). Secure to terminal (7) with washer (4) and
screw (5). Have helper assist.
3.
Install circuit 3 lead (8) through back of power distribution box (2). Secure to terminal (9) with washer (4) and screw (5).
Have helper assist.
4.
Install lid (10) on power distribution box (2). Secure with 12 new lockwashers (11) and screws (12).
5.
Install power distribution box (2) on bulkhead. Secure with two washers (13) and screws (14).
6.
Connect cable (15) to connector (16) on power distribution box (2).
FOLLOW-THROUGH STEPS
1.
Connect battery ground lead (WP 0294 00).
END OF TASK