TM 9-2350-261-20-4
REPLACE/REPAIR POWER DISTRIBUTION BOX A3 (M1068 ONLY)
THIS WORK PACKAGE COVERS:
INITIAL SETUP:
Personnel Required
Maintenance Level
Power-Generation Equipment Repairer 52D10
Unit
Helper (H)
Tools and Special Tools
Equipment Condition
Engine stopped (see your -10)
Materials/Parts
Carrier blocked (see your -10)
Locknut (4)
All external power disconnected (TM 11-7010-256-
Lockwasher (12)
12&P)
Battery ground lead disconnected (WP 0294 00)
REMOVAL
NOTE
Tag all wires before removal.
1.
Disconnect cable (1) from connector (2) on power distribution box (3).
2.
Remove 12 screws (4), lockwashers (5), and lid (6) from power distribution box (3). Discard lockwashers.
3.
Remove screw (7), washer (8), and two circuit 1 leads (9) from terminal 1 (10).
4.
Remove screw (7), washer (8), and two circuit 2 leads (11) from terminal 2 (12).
5.
Remove screw (7), washer (8), and circuit 3 lead (13) from terminal 3 (14).
6.
Remove two screws (15), washers (16), and power distribution box (3) from bulkhead.