TM 9-2350-261-20-4
REPLACE BULKHEAD CONNECTION TO COOLANT HEATER
FUEL INLET HOSE TUBE
THIS WORK PACKAGE COVERS:
INITIAL SETUP:
Maintenance Level
Equipment Condition
Unit
Engine stopped (see your -10)
Carrier blocked (see your -10)
Tools and Special Tools
Ramp lowered (see your -10)
Power plant rear access panel removed (WP 0431 00,
WP 0432 00, or WP 0433 00)
Personnel Required
Personnel heater duct removed (WP 0617 00)
Unit Mechanic
Front floor plate removed (WP 0437 00,
WP 0438 00, WP 0440 00, or WP 0441 00)
Trim vane lowered and power plant front access door
open (see your -10)
Heater fuel shutoff valve closed (see your -10)
0644 00-1