T M70.71.72.73.74.75.Install nipple (1) and nut (2) on traversebeam inside power plant rear bulkhead.Connect tube assembly (3) to nipple (1).Install elbow (4) on tube assembly (3).Install quick disconnect half (5) onelbow (4).Connect fuel supply hose (6) to nipple (1).Connect quick disconnect half (7) to quickdisconnect half (5) at power plant rearbulkhead.FOLLOW-THROUGH STEPS 1.2.3.4.Fill fuel tanks (see your -10).5.Connect battery ground leads (page 13-2).6.Start engine (see your –10). Check for leaks.7.Install power plant rear access panel8.(page 24-27).9.Install heater duct (page 29-47).Install floor plates (page 24-38).Raise and lock ramp (see your -10).Stop/shutdown engine (see your -10).Unblock earner (see your -10).END OF TASK6-48.8Change 29-2350-261-20-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business