Table 2-1. Unit Level Preventive Maintenance Checks and Services for M113A2 FOV
Item
Interval
Item To
Procedure
Not Mission
No.
Be
Capable If:
Inspected
92
Semi-
Chemical
NOTE
Annual
Agent
Additional data on Chemical
Auto-
Agent Automatic Alarm Kit for
matic
the M113 FOV can be found in:
Alarm Kit
TM 3-6665-224-12 Operators and
Unit Manual
Continued
TM 3-6665-274-20 Unit Mainte-
nance Manual
TM 9-2350-261-24P Unit Repair
Parts Manual.
Check mounting screws on junction
box. Tighten loose screws to 72 lb-in (8
N.m) torque. Use torque wrench (Item
93, Appendix D) and socket set (Item
89, Appendix D).
Check grommet. Replace cracked or
worn grommet.
Check cable and circuit breaker termi-
nals. Tighten loose connections. Re-
place damaged terminals (page 44-4).
Check cables.
Replace frayed or
cracked cables (page 44-5).
2-114 Change 3
TM 9-2350-261-20-1