TM 9-2350-261-20-l2 - 6 0 C h a n g e 4ItemNo.29Table 2-1. Unit Level Preventive Maintenance Checks and Services for M113A2 FOVIntervalSemi-AnnualItem ToBeInspectedProcedureNot MissionCapable If:Genera-torSetEnclosure(M577A2only)Tighten or replace loose or missingscrews on enclosure to 55-60 lb-ft(75-81 N.m) torque. Use torquewrench (Item 97, Appendix D).Replace damaged enclosure (page24-118).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business