Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Table 2-1. Unit Level Preventive Maintenance Checks and Services for MI13A2 FOV cont. - TM-9-2350-261-20-1_106
Table 2-1. Unit Level Preventive Maintenance Checks and Services for MI13A2 FOV cont. - TM-9-2350-261-20-1_108
TM-9-2350-261-20-1 Carrier Personnel Full Tracked Armored M113A2 2350-01-068-4077 Carrier Command Post Light Tracked M577A2 2350-01-068-4089 Manual
Page Navigation
76
77
78
79
80
81
82
83
84
85
86
TM 9-2850-261-20-1
Table
2-1.
Unit Level Preventive Maintenance Checks and Services for M113A2 FOV
Itern
Interval
Item To
Procedure
Not Mission
No.
Be
Capable If:
Inspected
25
Semi-
Suspen-
Replace leaking suspension lockout
Annual
sion Lock-
cylinders (page 28-74)
out Cylin-
ders
(M741A1
only)
26
Semi-
Track
Replace torn shrouds. Tighten or re-
Annual
Shroud
place loose or missing hardware. Re-
pair bent shroud clamps.
27
Semi-
Flotation
Repair or replace flotation pods that
Annual
Pods
have bulging foam (page 24-215).
(M741A1
only)
Tighten all flotation pod mounting
screws.
2-58 Change 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business