TM 9-2350-261-20-1
Table 2-1. Unit Level Preventive Maintenance Checks and Services for M113A2 FOV
Item
Interval
Item To
Procedure
Not Mission
No.
Be
Capable If:
Inspected
17
Semi-
Idler/
Replace grease fittings and relief
Any leaking grease
Annual
Road
valves if they are leaking (page 22-9 or
fittings are found.
Wheels
22-17).
and Idler/
Road
Wheel
Hubs
Continued
18
Semi-
Idler and
Replace bent, broken or stripped idler/
Any broken, bent or
Annual
Road
road wheel hub ribbed bolts (page 22-9
stripped bolts.
Wheel
or 22-16). Refer to page 2-53 for idler
Hub
components.
Ribbed
Bolts
2-54 Change 3