TM 9-2350-247-34
INSTALL TURN SIGNAL KIT Continued
0076 00
INSPECTION-ACCEPTANCE AND REJECTION CRITERIA
INSPECT
1.
Check brackets, lights, control, and flasher. Look for secure mounting. Make sure all lock washers are installed under
screw heads and nuts, or between brackets for proper grounding of parts.
TEST AND INSPECTION
TEST
1.
Connect battery negative lead(s) (see your -20).
2.
Turn MASTER SWITCH ON.
3.
Place main light selector switch in STOP or SER. DRIVE position.
4.
Move lever control assembly to left. Check left front turn signal light and left rear stoplight-taillight. Control lever light,
left front signal light, and left stoplight-taillight should flash intermittently. There should also be 24 volts intermittently
at pin B of trailer light receptacle. If brakes are applied, left stoplight-taillight should be ON and 24 volts at pin B of
trailer light receptacle.
5.
Move lever on control assembly to right. Check right front turn signal light and right rear stoplight-taillight. Control
lever light, right front turn signal light, and right stoplight-taillight should flash intermittently. There should also be 24
volts intermittently at pin B of the trailer light receptacle. If brakes are applied, left stoplight-taillight should be ON and
24 volts at pin B of trailer light receptacle.
6.
Lift stop on lever on control assembly, and move lever to extreme right. Light on control lever, both front turn signal
lights, and both rear stoplight-taillights should flash intermittently. There should also be 24 volts intermittently at pins B
and J of the trailer light receptacle.
7.
Place main light selector switch in B.O. DRIVE position and infrared blackout selecting switch in B.O. position. Front
blackout marker lights, blackout headlights, and blackout marker lights in taillights should come on. In addition, new
right blackout stoplight should come on when both differential steering levers are pulled to brake carrier.
PAINT
1.
Clean and paint all exposed unpainted metal surfaces as needed after final inspection and test in accordance with
TM 43-0139.
FOLLOW-THROUGH STEPS
1.
Install cargo compartment floor plates (see your -10).
END OF TASK
0076 00-26