TM 9-2350-247-20-3REPLACE FLASHER — Continued 0509 00INSTALLATION1. Place new gasket (9) and bar (6) on inside of carrier. Secure with two screws (7) and new lock washers (8) from outsideof carrier.2. Place flasher (2) on bar (6). Secure with ground lead (5), three new lock washers (4), and two screws (3). Install onewasher on each side of ground lead terminal.3. Connect harness lead (1) to flasher (2).FOLLOW-THROUGH STEPS1. Check flasher for proper operation.END OF TASK0509 00-2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business