Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
REPLACE VEHICLE COMPARTMENT HEATER FUEL HOSES, TUBES, AND FITTINGS (KIT I) (M548A1) Continued
REPLACE VEHICLE COMPARTMENT HEATER FUEL HOSES, TUBES, AND FITTINGS (KIT II OR III) (M548A1) Continued - TM-9-2350-247-20-3_318
TM-9-2350-247-20-3 Carrier Cargo Tracked 6 Ton M548A12350010969356 (EIC: AEU) M548A3 2350013696081 (EIC: AE9) Manual
Page Navigation
251
252
253
254
255
256
257
258
259
260
261
TM 9-2350-247-20-3
REPLACE VEHICLE COMPARTMENT HEATER
FUEL HOSES
, TUBES, AND
FITTINGS (KIT II OR III) (M548A1)
0445 00
THIS WORK PACKAGE COVERS:
Removal (page 0445 00-1).
Installation (page 0445 00-3).
INITIAL SETUP:
Maintenance
Level
Unit
T
o
ols
and
Special
T
o
ols
General Mechanic’s Tool Kit (WP 0541 00, Item 57)
Materials/Parts
Sealing compound (WP 0542 00, Item 33)
Lock washer (2)
Lock nut (2)
Preformed packing
P
ersonnel
Required
Unit Mechanic
References
See your -10
Equipment Condition
Engine stopped (see your -10)
Carrier blocked (see your -10)
Battery negative lead disconnected (WP 0292 00)
Top left access grille removed (WP 0390 00)
REMOVAL
1.
Remove hose
(1) from elbow (2) and elbow (3).
2.
Remove two screws (4), two lock nuts (6), and four clamps (7) securing hose (1) to bulkhead. Discard lock nuts.
3.
Remove elbow (2) from coupling (8).
4.
Remove coupling (8) from fuel pump (9).
0445 00-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business