TM 9-2350-247-20-1REMOVE/INSTALL POWER PLANT (M548A1) — Continued 0130 00NOTEUse previously placed tags to identify cables and connectors.24. Connect power plant bulkhead cable connector to bulkhead connectors.a. Connect regulator-to-bulkhead cable connector (1) to bulkhead connector (2).b. Connect starter-to-bulkhead cable connector (3) to bulkhead connector (4).c. Connect power plant wiring harness connector (5) to bulkhead connector (6).25. Close all cooling system drain valves. Fill cooling system (WP 0212 00).26. Install all oil drain plugs (engine, transmission, and transfer gearcase) and fill engine transmission and transfer gearboxwith oil (WP 0128 00).27. Install air cleaner hose (WP 0153 00).WARNINGKeep your hands, arms, and clothing away from rotating belts, pulleys, and shafts. Look, do nottouch.28. Start engine (see your -10).29. Check fan, generator, and air compressor drive belts for proper operation. Adjust drive belts if necessary (WP 0226 00)and (WP 0240 00).30. Check power plant operation for fuel, oil, and coolant leaks and loose parts.31. Stop engine (see your -10).0130 00-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business