• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONVEYOR CHAIN  MAINTENANCE
conveyor chain maintenance

TM-9-2350-267-10 Carrier Personnel Full Tracked Armored M113A2 2350-01-068-4077 Carrier Command Post Light Tracked M577A2 2350-01-068-4089 Manual
Page Navigation
  302    303    304    305    306  307  308    309    310    311    312  
TM  9-2350-267-10 CONVEYOR CHAIN MAINTENANCE - Continued 4. Using four new rivet and nail assemblies (4) and rivet gun (5), install  replamment pad(s)  as  follows: a. b. c. d. e. f. Spread  rivet  gun  handles. lnsert new rivet and nail assemblies (4) Into rivet gun (5) as shown, pointed  end  first. Place rivet end of nail through hole of replacement pad and existing plate. While holding pad against plate with rivet and nail (4) and rivet gun (5), repeatedly  squeeze  rivet  gun  handles  together  until  rivet  ‘pops”  from  nail. Spread rivet gun handles and  remove  nail. Repeat steps “a” through “e”  for each pad hole until all replacement pads are  installed. 2. 3. NOTE It is not necessary  to break chain to replace damaged conveyor pad(s). For pad replacement see page 3-36. Turn  off  hydraulic  system. Use conveyor manual crank to move damaged portion of chain to bottom side of conveyor. Relieve chain  tension  (p  3-39). 3-37







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.