• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Loading  and  Stowing  Projectiles
Moving  Projectile  Racks

TM-9-2350-267-10 Carrier Personnel Full Tracked Armored M113A2 2350-01-068-4077 Carrier Command Post Light Tracked M577A2 2350-01-068-4089 Manual
Page Navigation
  200    201    202    203    204  205  206    207    208    209    210  
TM 9-2350-267-10 PROJECTILE RACK OPERATION - Continued Unloading   Projectiles 1. 2. NOTE Before  beginning  to  unload  projectiles  from  racks: l Vehicle must be on level ground. l Conveyor  must  be  deployed,  positioned  and  operational (p2-148). Stacker must be released from its stowed position (p 2-167). Unlock only rack to be unloaded by releasing both handles (1) from locking clips  (2). NOTE If  necessary,  install  extension  handle  over  projectile  rack handles  to  obtain  additional  leverage. Secure  handles  in  unlocked  position  by  pushing  them  upward  and  locking them with locking clips (3) on rack above. Handles on top racks can be re- tained by locking clip on stowage boxes. NOTE If  any  projectile  sticks,  refer  to  troubleshooting  section p 3-17). 2-185







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.