• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATING THE APU - Continued - TM-9-2350-267-10_155
Charging Low Batteries with APU

TM-9-2350-267-10 Carrier Personnel Full Tracked Armored M113A2 2350-01-068-4077 Carrier Command Post Light Tracked M577A2 2350-01-068-4089 Manual
Page Navigation
  137    138    139    140    141  142  143    144    145    146    147  
TM   9-2350-267-10 OPERATING THE APU - Continued NOTE Check BATTERY indicator in each vehicle at least once per hour. If charge indicator needle (6) drops below half- way  in  yellow  range  (7)  in  either  vehicle,  start  both  main  en- gines. Allow engines to run until charge needles move into normal range. If indicators show low charge, do not shut down APU until both main engines are started. 8. 9. 10. To  stop  this  operation,  turn  APU  GENerator  switch  (5)  OFF  and  turn  OFF the  APU  FUEL  SHUT  OFF  switch  (8). To  avoid  injury,  turn  MASTER  switches  OFF  in  both vehicles  before  disconnecting  slave  cable. Turn  MASTER  switch  OFF  in  both  vehicles. Disconnect  and  stow  cable. 2-122







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.