Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 9-3. ENGINE COMPARTMENT BULKHEAD INSULATION AND SHIELDS REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2350-287-34 9-3.  ENGINE  COMPARTMENT  BULKHEAD  INSULATION  AND  SHIELDS  REPLACEMENT. This  Task  Covers: a.   Removal b.   Installation Initial Setup: Tool/Test    Equipment: Personnel  Required:  Three • General mechanic’s tool kit (Item 19, Appendix  D) Equipment   Conditions: • Powerpack removed (refer to Materials/Parts: TM 9-2350-287-20-1). • Adhesive (Item 2, Appendix B) • Lower fuel tank removed (para 4-4). • Drycleaning solvent (Item 9, Appendix B) • Engine mount release bar removed (para 3-5). • Rag (Item 17, Appendix B) • Engine air cleaner ducts and hoses removed • Sealing compound (Item 21, Appendix B) (refer to TM 9-2350-287-20-1 ). a. REMOVAL To  remove  shield To  remove  shield NOTE (3), perform steps (23), perform step To remove shields (19, 20, and 27), 1. Unscrew two nuts (5) and remove tube (6). 1 through 3. 5. perform steps 1 through 12. 2. Remove 13 screws (1), eight washers (7) and five washers (2) from shield (3) and bulkhead (4). 3. Remove shield (3) from bulkhead 4. Remove two screws (8), washers (4). (9), and shield (10) from bulkhead (4). 9-8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business