| |
TM 9-2350-287-20-2
22-5.
HOSE ASSEMBLY REPLACEMENT (continued).
11.
12.
c.
1.
2.
3.
4.
5.
6.
Install hose (5) onadapter (7) on air heater
(4) with clamp (6).
Install hose (1) on adapter (3) on air heater
(4) with clamp (2).
LEFT SIDE CREW LOWER STATION
HEATER TO CONNECTOR HOSE
ASSEMBLIES REMOVAL
If NBC contamination
is suspected, air hoses
should be replaced
only by authorized
personnel. Failure to
follow this warning may
result in severe injury
or death to personnel.
Remove clamp (43) and hose (38) from
adapter (44) on air heater (45).
Disconnect hose (38) from air purifier (9).
Remove clamp (37) and quick-disconnect
coupling half (36) from hose (38).
Remove clamp (46) and hose (42) from
adapter (47) on air heater (45). Discard
clamp.
Disconnect hose (42) from orifice
connector (39).
Remove clamp (41) and quick-disconnect
coupling half (40) from hose (42). Discard
clamp.
22-13
WARNING
|