| |
TM 9-2350-287-20-2
22-5.
HOSE ASSEMBLY REPLACEMENT (continued).
7.
8.
6.
Install two hoses (5 and 22) on tube coupling (21)
with two new clamps (20).
Secure hose (22) to hydraulic tube clamp (15) and
left side canister compartment shelves (19) with
two clamps (16), new lockwashers (1 8), and screws
(17).
Install quick-disconnect coupling half (8) on hose
(1) with clamp (10).
9.
Connect hose (1) to air purifier (9).
10.
Secure hose (1) to bulkhead with strap (1 4), washer
(13), new Iockwasher (12), and screw (11 ).
22-12
|