| |
21-16. AFES MANUAL DISCHARGE SYSTEM REPAIR (continued).
e.
1.
2.
3.
4.
5.
6.
7.
8.
ADJUSTMENT
Remove slack from bottom cable (17) at cable
block (12) in actuator assembly (3). Set nut (8)
against cable block (12). Turn nut (7) until flush
against nut (8).
Remove slack from middle cable (l). Set nut (8)
for a l/32-inch gap to cable block (12). Tighten
nut (7).
Remove slack front opcable (1). Set adjustment
nut (8) for a l/8-inch gap to actuator block (1 2).
Tighten connector nut (10).
Remove slack from handle cable (6). Remove
extinguisher seal (1 8). Adjust cable length for 1/
4- to l/2-inch gap between handle retaining
springs (75) and packing nut (22). Secure
actuator assembly end of cable to pin (4) by
tightening setscrew (5).
Cut off excess handle cable (6) length inside
actuator assembly (3) to leave between 3/8 to 1/
2-inch beyond pin (4).
Install fire extinguisher seal (18) through exterior
guard (76) and around handle (26).
Remove slack from handle cable (77). Tighten
cable cap nut (47) until cable cap nut (47) and
washer (48) rest against handle (51 ).
Tighten threaded fitting (42) against cable cap
nut (47).
FOLLOW-ON MAINTENANCE:
Activate engine AFES (para 21-2).
Activate crew AFES (para 21-3).
Install left and right projectile rack assemblies
(refer to TM 9-2350-287-10).
Connect battery ground cables (para 7-41).
21-66
TM 9-2350-287-20-2
|