| |
TM 9-2350-287-20-2
18-4.
APU ENGINE SUPPORT STAND AND SUPPORT ASSEMBLY REPLACEMENT
(continued).
2.
Disconnect two electrical connectors (13) from hour meter (14).
3.
Release electrical harnesses (5) from APU support stand (1) by removing SCreW (9), Iockwasher (8), washer
4.
5.
6.
(7), and clamp (6). Discard Iockwasher.
Disconnect ground lead connector (12) from generator (10).
Disconnect electrical lead 66 (11) from generator (10).
Attach lifting clevis (16) in APU lifting eye plate (15) and attach hoist to clevis.
18-10
|