Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 16-7. PERSONNEL HEATER REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   9-2350-287-20-2 16-7. PERSONNEL  HEATER  REPLACEMENT. This  Task  Covers: a.   Removal b.   Installation Initial Setup: Tools/Test Equipment: l General mechanic’s tool kit (Item 24, Appendix l) l Torque wrench, 0.375-inch single end drive (Item 68, Appendix I) Materials/Parts: l Cap and plug set (Item 13, Appendix D) l Teflon pipe sealant (ltem 63, Appendix D) l Lockwasher (4) (Item 194, Appendix H) Personnel  Required:  Two a. REMOVAL 1. Remove electrical connector (3) from personnel heater (2). 2  . Loosen clamp (7) and remove hose (8) from heater duct (6). Equipment Conditions: l Left and right projectile rack assemblies moved to rear of vehicl (refer to TM 9-2350-287-10). l Numbers 1 and 2 engine AFES cylinder bottles removed  (para  21-4). l Numbers 1 and 2 engine AFES cylinder bottle bracket straps, brackets, and mounts removed (para 21 -8). 3. Loosen clamp (5) and remove hose (4) from heater duct (6). 4. Loosen nut (10) on clamp (9), and remove exhaust tube (1) from personnel heater (2). 16-15

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business