| |
TM 9-2350-287-20-2
16-7.
PERSONNEL HEATER REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
l General mechanics tool kit (Item 24,
Appendix l)
l Torque wrench, 0.375-inch single end drive
(Item 68, Appendix I)
Materials/Parts:
l Cap and plug set (Item 13, Appendix D)
l Teflon pipe sealant (ltem 63, Appendix D)
l Lockwasher (4) (Item 194, Appendix H)
Personnel Required: Two
a.
REMOVAL
1.
Remove electrical connector (3) from personnel heater (2).
2 .
Loosen clamp (7) and remove hose (8) from heater duct (6).
Equipment Conditions:
l Left and right projectile rack assemblies moved
to rear of vehicl (refer to TM 9-2350-287-10).
l Numbers 1 and 2 engine AFES cylinder bottles
removed (para 21-4).
l Numbers 1 and 2 engine AFES cylinder bottle
bracket straps, brackets, and mounts removed
(para 21 -8).
3.
Loosen clamp (5) and remove hose (4) from heater duct (6).
4.
Loosen nut (10) on clamp (9), and remove exhaust tube (1) from personnel heater (2).
16-15
|