Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: e. INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2350-287-20-2 16-6. PERSONNEL  HEATER  DUCT  REPAIR  (continued). e. 1. 2. 3. 4. 5. INSTALLATION NOTE Splined nuts are force-fit from engine side of bulkhead. If nuts have fallen out or are damaged, notify Direct Support maintenance. Position heater duct (5), bracket (4), and duct guard (3) against bulkhead (6) with mounting holes alined with two splined nuts (7). Secure heater duct (5), duct guard (3), and bracket (4) to bulkhead (6) with two screws (1) and washers (2). Secure bottom of bracket (4) to bulkhead (6) with screw (12) and washer (11). Position bracket (8) on heater duct (5) and against bulkhead (6) with mounting hole alined with splined nut (7). Secure heater duct (5) and bracket (8) to bulkhead (6) with screw (10) and washer (9). FOLLOW-ON MAINTENANCE: l Install personnel heater outlet hose and tee assembly (para 16-5). l Perform operational check of heating and ventilating system (refer to TM 9-2350-287-10). l Move left and right projectile rack assemblies to front of vehicle (refer to TM 9-2350-287-10). 16-14

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business