Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FOLLOW-ON MAINTENANCE
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

16-5. PERSONNEL HEATER OUTLET HOSE, TEE ASSEMBLY, AND CONTROLS REPAIR (continued). 8. Install tee handle (16) on rod assembly (2). FOLLOW-ON MAINTENANCE: l Install heating and ventilating distribution hose (para 16-4). l Install numbers 1 and  2 engine AFES cylinder bottle bracket straps, brackets, and mounts (para 21-8). l Install numbers 1 and  2 engine AFES cylinder bottles (para  2-14). l Perform operational check of heating and ventilating system (refer to TM 9-2350-287-10). l Move left and right projectile rack assemblies to front of vehicle (refer to TM  9-2350-287-10). 16-11 TM  9-2350-287-20-2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business