| |
16-5. PERSONNEL HEATER OUTLET HOSE, TEE ASSEMBLY, AND CONTROLS REPAIR.
This Task Covers:
a. Removal
b. Disassembly
c. Cleaning and lnspection
d. Assembly
e. Installation
Initial Setup:
Tools/Test Equipment:
General mechanic’s tool kit (Item 24,
Appendix I)
Materials/Parts:
Drycleaning solvent (Item 28, Appendix D)
Rag (Item 56, Appendix D)
Cotter pin (Item 10, Appendix H)
Lockwasher (Item 121, Appendix H)
LockWasher (2) (Item 158, Appendix H)
LockWasher (4) (Item 174, Appendix H)
Equipment Conditions:
Left and right projectile rack assemblies moved
to rear of vehicle (refer to TM 9-2350-287-10).
Numbers 1 and 2 engine AFES cylinder bottles
removed (para 21 -4).
Numbers 1 and 2 engine AFES cylinder bottle
bracket straps, brackets, and mounts removed
(para 21-8).
Heating and ventilating distribution hose removed
(para 16-4).
a.
1.
2.
3.
4.
Unscrew tee handle (16) from rod (2).
Remove grommet (1) from bracket (17).
Remove clamp (8) from cap (7) and tee
assembly (13).
Remove screw (14), chain (10), and
cap (7) from tee assembly (13).
REMOVAL
16-8
TM 9-2350-287-20-2
|