| |
16-4.
HEATING AND VENTILATING DISTRIBUTION HOSES REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tool/Test Equipment:
Left projectile rack assembly moved
General mechanics tool kit (Item 24,
to rear of vehicle (refer to TM 9-2350-287-10).
Appendix I)
Upper and lower rear doors opened (refer to
TM 9-2350-287-10).
Equipment Conditions:
Vehicle parked on level ground (refer to
TM 9-2350-287-10).
a.
1.
2.
3.
b.
1.
2.
3.
4.
5.
REMOVAL
Loosen two clamps (5) securing heating and ventilating distribution hose (6) to heater duct (4) and duct (7).
Remove hose (6) and two clamps (5).
Loosen two clamps (8) securing heating and ventilating distribution hose (9) to fan assembly (1) and duct (7).
Remove hose (9) and two clamps (8).
Loosen clamp (3) securing hose (2) to heater duct (4). Remove hose (2) and clamp (3).
INSTALLATION
Position clamp (3) on heating and ventilating distribution hose (2) and install on heater duct (4). Tighten clamp
(3) to secure hose (2).
Install two clamps (8) on opposite ends of heating and ventilating distribution hose (9).
Install one end of heating and ventilating distribution hose (9) on fan assembly (1) and install other end on duct
(7). Tighten two clamps (8) to secure hose (9).
Install two clamps (5) on opposite ends of heating and ventilating distribution hose (6).
Install one end of hose (6) to heater duct (4) and install other end on duct (7). Tighten two clamps (5) to secure
hose (6),
16-6
TM 9-2350-287-20-2
|