Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: 15-84. PROJECTILE RACK ASSEMBLY BRACES REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2350-287-20-2 15-84.  PROJECTILE  RACK  ASSEMBLY  BRACES  REPLACEMENT. This Task Covers a.   Removal b.   Installation Initial Setup: Tools/Test Equipment: Lockwasher (3) (Item 166, Appendix H) General mechaniss tool kit (Item 24, Apppendix I) Equipment Conditions: . Vehicle parked on level ground (refer to Materials/Parts: TM 9-2350-287-10). Lockwasher (8) (Item 164, Appendix H) a. 1. 2. 3. 4. REMOVAL Remove two screws (20), Iockwashers (21), and washers (22), angle(3), and spacer (2) from outside auxiliary power unit (APU) compartment wall (1). Discard Iockwashers. Remove  two  screws  (19),  Iockwashers  (18),  and  washers  (17)  and  brace  (4)  from  angle  (3).  Discard Iockwashers. Remove three screws (12), Iockwashers (13), and washers (14) and angle (8) from middle top door (15). Discard  Iockwashers. Remove four screws (11), Iockwashers (10), and washers (9) and two braces (7 and 16) from angle (8). Discard  Iockwashers. 15-209

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business