| |
15-24. CANISTER DOORS REPAIR.
This Task Covers:
a. Removal
b. Disassembly
c. Cleaning and Inspection
d. Assembly
e. Installation
Initial Setup:
Tools/Test Equipment:
• LockWasher (8) (Item 143, Appendix H)
• Crowbar (Item 12, Appendix I)
• LockWasher (10) (Item 184, Appendix H)
• Endless sling (Item 20, Appendix I)
• Pad (Item 212, Appendix H)
• Five-ton hoist (Item 23, Appendix I)
• Pad (Item 213, Appendix H)
• General mechanic’s tool kit (Item 24,
Appendix I)
Personnel Required: Two
Materials/Parts:
Equipment Conditions:
• Adhesive, rubber (Item 5, Appendix D)
• Vehicle parked on level ground (refer to
• Drycleaning solvent (Item 28, Appendix D)
TM 9-2350-287-10).
• Sealing compound (Item 58, Appendix D)
• Canister door opened (refer to TM 9-2350-287-10).
a.
REMOVAL
NOTE
• Right and left canister doors are replaced the same way.
• Canister door does not have to be removed to replace latch and pad.
15-53
TM 9-2350-287-20-2
|